Services / Public Works / Arterial/Thoroughfare

127th Street Improvements

127th Street from Metcalf to Nall is a 1 mile section that required improvement due to the expanding population of Overland Park. This highly traveled section of roadway provides a route to the South Creek Business Park from residential neighborhoods to the east. BHC RHODES provided survey and engineering design for the improvements which consisted of reconstructing the existing two-lane roadway to a divided four-lane thoroughfare section and adding dual southbound left-turn lanes on Metcalf. The project also included sidewalks (with ADA ramp designs) that connect to the Tomahawk Creek trail system, landscaping enhancements, storm sewer design, decorative street lighting, bridge maintenance, RCB connection, traffic signal modifications, utility coordination, and extensive public involvement.

BHC RHODES Public Works 127th Street Improvements

Awards

ACEC of Kansas City Public Improvement Award

KSPE Outstanding Engineering Achievement Award


Other Arterial/Thoroughfare Projects

Kansas Avenue Improvements
Antioch Road (67th Street to Johnson Drive)
75th Street Improvements
Quivira Road Improvements


Browse By Service Segment


Development / Public Works / Surveying / Utilities /

NEWS


BHC RHODES Attending Wireless Infrastructure Show to Share Wireless Service

Development Trends Show Rise in Non-Traditional Healthcare

5 Essential Tips for Engineering Students Transitioning from University to Office



social_facebook social_linkedin social_twitter social_youtube


7101 College Blvd., Suite 400 Overland Park, KS 66210 Phone: (913) 663-1900

BHC RHODES is a trademark of Brungardt Honomichl & Company, P.A.