Skip to Content

Development

Office

LET'S TALK!

Farm Credit of Southwest Kansas

image description

This project required the property to be platted, including public right-of-way, a public street extension designed and utility mains extended. The street and utility main extensions were for the benefit of the new bank and build-out of other lots to the west and north. The bank site included a surface detention area designed to provide detention of the upstream runoff that would be generated as the upstream sites were developed. BHC provided the land surveying and platting services, as well as the civil engineering design for the bank site and the public street and utility main extensions. 

Back to top