Lone Elm Road from 119th Street to College Boulevard

image description

BHC completed design plans, specifications and estimate for 9,500 LF of 2-inch mill & overlay on Lone Elm Road from 119th Street to the northern limits. Selective curb & gutter  and sidewalks were replaced due to deterioration or damage. An 8 foot shared-use path replaced the existing 5 foot sidewalk to accommodate the multi-users of the area. A pedestrian actuator was installed at College Boulevard to improve the safety due to a power pole conflicting with line-of-sight of the signal. All ADA ramps were upgraded along with a mid-block crossing, pavement markings and permanent signage. 

 