BHC was selected by Leavenworth County to provide surveying and design services to improve 2 miles of rural roadway to meet arterial/collector standards. The criteria consisted of a 40 MPH design with 36’ wide asphalt and 4’ aggregate shoulders. The McIntyre Road improvements also included several large cross-road drainage structures.