BHC was awarded Phase Three of Park City’s Stormwater Master Plan, which includes six project locations within the city limits. These projects are designed to address the stormwater challenges of Park City, Kansas, a notably flat area where effective water movement can be difficult. The project scope includes implementing creative solutions for channel lining and protection that minimize long-term city maintenance, ensuring proper sizing of neighborhood culverts to manage stormwater efficiently, and constructing roadside ditches to keep water off roadways and improve overall drainage. Through these improvements, BHC is helping Park City proactively manage stormwater, protect infrastructure, and reduce localized flooding risks.