(913) 663-1900
Services / Public Works / Traffic Engineering & Signals

67th Street & I-35 Traffic Study

The City of Merriam tasked BHC RHODES with conducting a traffic study to evaluate existing traffic movements, safety issues and traffic signal operations. After collecting video-based traffic data, BHC RHODES’ traffic engineers examined the performance of the different phases of the traffic signals to identify specific issues and potential adjustments in the timing plan and signal equipment. As part of the on-site signal assessment, BHC RHODES was able to adjust the signal timing plan and reduce delays and overall phase length for vehicles by 10-15% without any equipment upgrades. After completing an analysis of the intersection’s overall performance, written recommendations and cost estimates were provided to City staff outlining different options to improve operations and safety at this interchange.

MAP
67th & I-35 Traffic Study


Other Traffic Engineering & Signals Projects

8th Street and Minnesota Avenue
Truck Route Traffic Study
Arrow Rock TEAP Study
Merriam Pointe Roundabout


Browse By Service Segment


Development / Public Works / Surveying / Utilities /

NEWS


Abandoned Underground Utilities Need Standardization

Girl Scouts Pop-Up STEM Series

Christmas In October

OSP Design for Building the Internet



social_facebook social_linkedin social_twitter social_youtube social_instagram
About | Services | Projects | News | Blog | Podcast | Join Our Team



Overland Park, KS
7101 College Blvd., Suite 400
Overland Park, KS 66210
Phone: (913) 663-1900
Directions to this office

Kansas City, KS
712 State Ave.
Kansas City, KS 66101
Phone: (913) 371-5300
Directions to this office

Dodge City, KS
705 1st Ave. Suite A
Dodge City, KS 67801
(620) 225-1400
Directions to this office



BHC RHODES is a trademark of Brungardt Honomichl & Company, P.A.