Services / Surveying / Construction Staking

Lenexa Mine

BHC RHODES provided above ground and subsurface construction staking to fill in areas of the mine that were at risk of a cave in. The work consisted of establishing control and staking remediation lines on the ceiling of the subsurface mine and staking the remediation line along with pilot holes. This allowed the contractor the ability to pump fill-in grout into the mine 85’ to 100’ below the surface and help prevent a cave-in.

BHC RHODES Surveying Lenexa Mine Remediation Construction Staking


Other Construction Staking Projects

Hollywood Casino at Kansas Speedway
Monticello Road and 95th Street
Hilltop at Briarcliff
Prescott Plaza


Browse By Service Segment


Development / Public Works / Surveying / Utilities /

NEWS


BHC RHODES Awarded Gold Workplace Wellness Certification

BHC RHODES’ Marketing Team Wins National Awards

The Importance of Giving Back to the Community



social_facebook social_linkedin social_twitter social_youtube


7101 College Blvd., Suite 400 Overland Park, KS 66210 Phone: (913) 663-1900

BHC RHODES is a trademark of Brungardt Honomichl & Company, P.A.