Two survey crews were sent to perform boundary scans for the building an additional berm at Bonanza’s Garden City, Kansas location. The construction of this additional berm will allow Bonanza to place additional silos containing their biomaterial. Design surveying helped determine the placement of the silo location and duct work connecting the established silos. BHC helped improve safety on the bio plant site. With the construction of the berm, potential leakage of bioenergy material will be contained. Survey work which established additional silos allows for more efficient product flow into Bonanza’s main facility.