With the renovation to Rachel Morado Park, the adjacent roadway needed a “road diet.” Sidewalk, curb and gutter, and retaining walls were added to provide connectivity to the park. Working with Phronesis, the 2,400-FT project was surveyed and utility coordination was provided. This project also included nine ADA sidewalk ramps and five driveways to be reconstructed.