103rd Street from Evening Star to Lexington Avenue/K-10 Interchange

image description

BHC is part of the progressive design-build team responsible for providing over 3 miles of improved roadway to serve the new Panasonic EV battery facility. These plans are scheduled to span within an 18-month period. BHC was responsible for surveying, stormwater design, and floodplain modeling for the project. This includes evaluating potential impacts to FEMA flood elevations and devising mitigation strategies to maintain a “no rise” condition after construction. BHC also developed an ESRI-based field inventory form to identify and catalog a large number of existing utility excavations throughout the project. This identified potential conflicts and quickly shared data across the design and construction teams. This allowed for real-time sharing of information.

Back to top