Skip to Content

Public Works

Complete Streets

LET'S TALK!

Hickman Mills Drive from E 77th Terrace to E 80th Street

image description

With the renovation to Rachel Morado Park, the adjacent roadway needed a “road diet”. Sidewalk, curb & gutter  and retaining walls were added to provide connectivity to the park. Working with Phronesis, the 2,400 FT project was surveyed and utility coordination was provided. This project also included nine ADA sidewalk ramps and five driveways to be reconstructed.

Back to top