At Amtrak’s station in Dodge City, the team needed to replace the passenger loading and unloading zone while maintaining clear, accessible paths for travelers. BHC provided site control and construction staking to support the improvements, then completed as-builts for project closeout. With multiple ADA ramps and tight tolerance areas, the record drawings captured the level of detail needed to document compliance and support long-term operations.