After repeated damage to the Brunswick Levee District system led to major flooding, the district needed emergency repairs that could be staked and built quickly, while still meeting strict U.S. Army Corps of Engineers requirements. BHC began by surveying existing conditions along the breached levee, then used that information to establish control and provide construction staking for the repair work. The result was a reliable field layout that helped the team move forward with emergency repairs under tight specifications.