BHC evaluated multiple bridges along a proposed middle-mile fiber ring to determine the optimal crossing method. The team completed field reviews to confirm structural integrity, spatial availability, and attachment constructability. BHC selected and delivered three bridge-attachment crossings, including two Rio Grande River crossings. The team reviewed existing structural plans and designed custom attachment systems that met bridge-owner requirements. BHC produced detailed drawings to support permitting and construction.